Spec Home or Build to Order?

One gets you a better deal. The other gets you the house you wanted.

By William Zhang, Austin Realtor · Updated

The short answer

A spec or quick move-in home is already built or nearly finished, so it carries the larger incentive, a known price and a short timeline, but you take the finishes someone else chose. A build to order lets you pick the lot, plan and finishes, and costs more because the design center is where builder margin lives. In the Austin market the biggest concessions are almost always on standing inventory, particularly near a quarter end.

Why specs carry the bigger incentive

A completed unsold home is capital the builder cannot recycle. Every month it stands it costs them carrying cost and it counts against the community's absorption rate. That pressure is what funds the concession, and it grows the longer the house sits.

A to-be-built home has none of that pressure. You are paying them to start work, so there is nothing for them to be anxious about and correspondingly little to negotiate.

What you actually give up on a spec

The finishes, the lot, and sometimes the floor plan. Builders specify spec homes to broad taste, which usually means safe and slightly generic. Whether that matters depends on how much you were going to change anyway.

What you do not give up is quality. A spec is built to the same standard as a to-be-built in the same community by the same crews.

When build to order is worth the premium

When you need something structural that no standing home has: a specific plan, a particular lot orientation, an extended room, a casita, a third bay. Structural items cannot be added later at sensible cost, and that is the real argument for building.

It is much weaker when the difference is finishes. Flooring, counters and fixtures carry builder margin and can usually be done after closing for less. Paying design-center pricing for cosmetics you could change in year two is the most common way buyers overspend.

The timing risk on a build

A build running six months or more means your rate is exposed for the whole period on a house you are already committed to buy. That makes the rate lock terms part of the price rather than paperwork. Ask what extended locks are available, whether a float-down exists, whether it is automatic or must be requested, and who pays for it.

Also ask what happens if the builder is late. The penalties for a buyer closing late are usually spelled out in detail. The remedies when the builder is late are usually not.

I am a licensed Texas real estate agent, not an attorney. Nothing here is legal advice, and I do not interpret builder contracts, addenda or warranty terms — that is a real estate attorney's job, not mine. What I can do is represent you through the negotiation, the inspection and the walkthrough, and tell you when something belongs in front of a lawyer.

Answered

Are quick move-in homes cheaper in Austin? ▾

Usually yes on an effective basis, because they carry the larger incentive rather than a lower list price. A standing home that has been complete for several months is where the biggest concessions in this market are, and the effect strengthens near a quarter or year end when builders manage to closing counts. Ask the sales office which homes have been standing longest; they will generally tell you.

Can I still choose finishes on a spec home? ▾

Generally not, because they are already installed. Occasionally a home that is under construction but unsold can still take selections if it has not reached that stage, which is the best of both cases: partial choice with some of the inventory pressure. Ask the sales office which homes are started but not yet drywalled.

How long does a build to order take in Austin? ▾

Commonly six to twelve months depending on the builder, the plan and where the community sits in its buildout, and schedules slip. Treat the estimate as an estimate and plan your rate lock around the pessimistic case rather than the brochure date. If you want to know where you stand if the builder runs late, that is a question for a real estate attorney.